Skip to main content
+65 6316 8500
Service Menu
  • News
  • Resources
  • Careers
  • Worldwide contacts
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Vibro compaction
        • Vibro stone columns
        • Vibro concrete columns
        • Dynamic compaction
        • Dynamic replacement
        • Rapid impact compaction (RIC)
        • Dry soil mixing
        • Mass mixing
        • Wet soil mixing
      • Grouting
        • Cavity grouting
        • Compaction grouting
        • Jet grouting
        • Permeation grouting
        • Rock / fissure grouting
      • Deep Foundations
        • Micropiles
        • Bored piles
      • Earth retention
        • Anchors
        • Wet soil mixing
    • Solutions
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Liquefaction mitigation
        • Underpinning
      • Excavation support
      • Remediation
      • Seepage control
      • Stabilisation
        • Void filling
        • Tunnelling
      • Slope stabilisation
    • Markets
      • Industrial
      • Infrastructure
      • Oil, gas and chemical
      • Power
    • Design and build
  • Projects
  • How we work
    • Code of conduct
    • Values
    • Health and safety
    • Diversity and inclusion
    • Quality
    • Supporting our women
    • Sustainability
    • COVID-19 response
  • About us
    • Our leadership
    • Our commitment
    • About Keller Group
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Local offices
    • Request a quote
    • Get assistance

Search results

Filter results

  • All results (163)
  • Project (40)
  • Resource (40)
  • Content page (27)
  • Technique (18)
  • News article (16)
  • Solution (9)
  • Landing page (5)
  • Market (4)
  • Office (4)
Request a quote
Get assistance
Offshore Stone Columns in Pulau Tekong
Project
Offshore Stone Columns in Pulau Tekong Keller executed non-dredged ground improvement method and its first major application of Keller offshore stone column technology. Offshore stone columns in…
/projects/offshore-stone-columns-pulau-tekong
Download
Keppel Merlimau Cogen foundation works project summary
Resource
Keppel Merlimau Cogen foundation works project summary Vibro compaction in progress Infosheet Using Keller’s local track record, we worked closely with Alstom to demonstrate the benefits of vibro…
/node/2851
Yard Upgrade at PTSC MC Yard
Project
Yard Upgrade at PTSC MC Yard Keller’s proposed Ground improvement solution, Vibro stone columns enabled an early start of mechanical structure construction enabling our client to accelerate their…
/projects/yard-upgrade-ptsc-mc-yard
Download
Offshore stone columns in Pulau Tekong project summary
Resource
Offshore stone columns in Pulau Tekong project summary Keller's offshore stone column technology Infosheet Keller executed non-dredged ground improvement method and its first major application…
/node/2861
Download
Yard upgrading at PTSC MC yard project summary
Resource
Yard upgrading at PTSC MC yard project summary Upgraded yard in operations Infosheet Keller’s proposed Ground improvement solution, Vibro stone columns enabled an early start of mechanical structure…
/node/2866
Resorts World Sentosa Reclamation
Project
Resorts World Sentosa Reclamation Keller provided cost effective design and build solution to client . Our suitable machine type mobilized, enabling easy movement on site and timely completion…
/projects/resorts-world-sentosa-reclamation
Download
Tank farm expansion project summary
Resource
Tank farm expansion project summary Vibro stone column in progress Infosheet Keller's significant project pre-planning ensured minimization of time lost due to the challenges of working on an…
/node/2876
Download
Reclamation for Resorts World Sentosa project summary
Resource
Reclamation for Resorts World Sentosa project summary Wet soil mixing stabilising the reclaimed area Infosheet Keller provided cost effective design and build solution to client . Our suitable…
/node/2881
Vibro Compaction for Universal Terminal
Project
Vibro Compaction for Universal Terminal Keller completed 200,000m2 of ground improvement up to 35m deep, all within 6 months time. Universal terminal vibro compaction by Keller Singapore The project…
/projects/vibro-compaction-universal-terminal
Download
Vibro compaction for Universal Terminal project summary
Resource
Vibro compaction for Universal Terminal project summary Overview of Universal Terminal Infosheet Keller completed 200,000m2 of ground improvement up to 35m deep, all within 6 months time. Download
/node/2891
Nghi Son Petrochemical Refinery Complex
Project
Nghi Son Petrochemical Refinery Complex Keller employed the Vibro replacement method using Stone columns to treat the area approximately 55,000 square meters, the largest stone column project in…
/projects/nghi-son-petrochemical-refinery-complex
Download
Nghi Son petrochemical refinery complex project summary
Resource
Nghi Son petrochemical refinery complex project summary Vibro stone column in progress Infosheet Keller employed the Vibro replacement method using Stone columns to treat the area approximately 55,…
/node/2901
Jimah East Coal Fired Power Plant
Project
Jimah East Coal Fired Power Plant Keller effectively dealt with various and unexpected site challenges while successfully completing the work on time with a cost-effective, packaged solution. Jimah…
/projects/jimah-east-coal-fired-power-plant
Lotte Chemical Plant
Project
Lotte Chemical Plant Keller completed piling works in a congested live plant with sensitive equipment, live underground utilities and stringent health and safety requirements. The project included…
/projects/lotte-chemical-plant
Download
Jimah East power plant project summary
Resource
Jimah East power plant project summary Works in progress Infosheet Keller effectively dealt with various and unexpected site challenges while successfully completing the work on time with a cost-…
/node/2916
Singapore Lube Park
Project
Singapore Lube Park 6 cranes mobilized to accelerate the work program, as Keller provided turnkey design, construction and monitoring package. Singapore Lube Park project by Keller The project The…
/projects/singapore-lube-park
Download
Lotte chemical plant project summary
Resource
Lotte chemical plant project summary Micropile in live plant Infosheet Keller completed piling works in congested live plant with sensitive equipment, live underground utilities and stringent health…
/node/2926
Download
Lube Park project summary
Resource
Lube Park project summary 6 VC crane in action Infosheet 6 cranes mobilized to accelerate the work program, as Keller provided turnkey design, construction and monitoring package. Download
/node/2931
Download
Phosphate complex project summary
Resource
Phosphate complex project summary VCC and DSM in progress Infosheet Keller designed and built an optimal and cost-effective foundation system while overcoming problems posed by varied and challenging…
/node/2936
Download
Tuas Hull Shop project summary
Resource
Tuas Hull Shop project summary 7 vibro strings in action Infosheet Keller’s alternative multi-product ground improvement scheme resulted in substantial savings over the conforming driven pile design…
/node/2941

Pagination

  • Previous page ‹‹
  • Page 4
  • Next page ››
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller ASEAN 

18 Boon Lay Way
#04-104 Tradehub
Singapore 609966

Footer links
  • Keller Group
  • Careers

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Sitemap
Social links
  • LinkedIn
  • YouTube