Skip to main content
+65 6316 8500
Service Menu
  • News
  • Resources
  • Careers
  • Worldwide contacts
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Vibro compaction
        • Vibro stone columns
        • Vibro concrete columns
        • Dynamic compaction
        • Dynamic replacement
        • Rapid impact compaction (RIC)
        • Dry soil mixing
        • Mass mixing
        • Wet soil mixing
      • Grouting
        • Cavity grouting
        • Compaction grouting
        • Jet grouting
        • Permeation grouting
        • Rock / fissure grouting
      • Deep Foundations
        • Micropiles
        • Bored piles
      • Earth retention
        • Anchors
        • Wet soil mixing
    • Solutions
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Liquefaction mitigation
        • Underpinning
      • Excavation support
      • Remediation
      • Seepage control
      • Stabilisation
        • Void filling
        • Tunnelling
      • Slope stabilisation
    • Markets
      • Industrial
      • Infrastructure
      • Oil, gas and chemical
      • Power
    • Design and build
  • Projects
  • How we work
    • Code of conduct
    • Values
    • Health and safety
    • Diversity and inclusion
    • Quality
    • Supporting our women
    • Sustainability
    • COVID-19 response
  • About us
    • Our leadership
    • Our commitment
    • About Keller Group
Search
Menu
Close
      Contact US Dropdown Menu
      • Contact us
        • Local offices
        • Request a quote
        • Get assistance
      • Techniques
        • Ground improvement
        • Grouting
        • Deep Foundations
        • Earth retention
      • Solutions
      • Markets
      • Design and build
      • Vibro compaction
      • Vibro stone columns
      • Vibro concrete columns
      • Dynamic compaction
      • Dynamic replacement
      • Rapid impact compaction (RIC)
      • Dry soil mixing
      • Mass mixing
      • Wet soil mixing
      • Cavity grouting
      • Compaction grouting
      • Jet grouting
      • Permeation grouting
      • Rock / fissure grouting
      • Micropiles
      • Bored piles
      • Anchors
      • Wet soil mixing
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Liquefaction mitigation
        • Underpinning
      • Excavation support
      • Remediation
      • Seepage control
      • Stabilisation
        • Void filling
        • Tunnelling
      • Slope stabilisation
      • Industrial
      • Infrastructure
      • Oil, gas and chemical
      • Power

      Search results

      Filter results

      • All results (159)
      • Project (40)
      • Resource (40)
      • Content page (27)
      • Technique (18)
      • News article (16)
      • Solution (9)
      • Market (4)
      • Office (4)
      • Vacancy (1)
      Request a quote
      Get assistance

      Filter results

      • All results (159)
      • Project (40)
      • Resource (40)
      • Content page (27)
      • Technique (18)
      • News article (16)
      • Solution (9)
      • Market (4)
      • Office (4)
      • Vacancy (1)
      Request a quote
      Get assistance
      Download
      Tuas Hull Shop project summary
      Resource
      Keller’s alternative multi-product ground improvement scheme resulted in substantial savings over the conforming driven pile design.
      /sites/keller-asean/files/2019-10/project-summary-ground-improvement-jurong-shipyard-tuas-hull.pdf
      Download
      Jurong West residential building project summary
      Resource
      Unexpected highly variable soil and rock strata was drilled while maintaining quality, safety and program requirements. Cavity probing and grouting method helped to reduce the concrete consumption of bored pile installation in the later stage of construction.
      /sites/keller-asean/files/2019-10/project-summary-grouting-jurong-west-residential_0.pdf
      Download
      Mediapolis business park project summary
      Resource
      Keller provided packaged solution, including close coordination with all stakeholders and adoption of Polyform guide wall, which saved significant amount of time and accelerated basement construction. The project was also completed ahead of schedule without incidents
      /sites/keller-asean/files/2019-10/project-summary-earth-retention-mediapolis-business-park.pdf
      Download
      Hoa Phat Dung Quat steel complex project summary
      Resource
      Keller completed the project ahead of schedule with high quality and zero incident. Deep vibro technique was utilized as foundation solution for 14m height iron ore stockpile to limit the allowable settlement and minimize surrounding pile’s lateral movement.
      /sites/keller-asean/files/2019-10/project-summary-ground-improvement-hoa-phat-steel.pdf
      Download
      Lhoist lime plant project summary
      Resource
      Keller provided design and build solution that directly resulted in time and cost savings, executed ground improvement and foundation work in complex soil conditions and successfully transformed marginal land into a valuable production site.
      /sites/keller-asean/files/2019-10/project-summary-ground-improvement-lhoist-lime-plant.pdf
      Download
      Hong Kong link road project summary
      Resource
      Keller innovated on our use of equipment to allow limited headroom stone column construction, while complying to stringent airport safety standards.
      /sites/keller-asean/files/2019-10/project-summary-ground-improvement-hong-kong-link-road.pdf
      Download
      Karimun petroleum storage terminal project summary
      Resource
      Keller provided design and built solution that generated savings for the client and successfully carried out the work with no incident or injuries.
      /sites/keller-asean/files/2019-10/project-summary-ground-improvement-karimun-storage-terminal.pdf
      Download
      Brooke Dockyard's crane platform project summary
      Resource
      Keller introduced the well-received Cone Penetration Test method to Sarawak and an alternative stone column solution that produced considerable savings to the owner.
      /sites/keller-asean/files/2019-10/project-summary-ground-improvement-brooke-dockyard-platform.pdf
      Download
      Puteri Harbour development project summary
      Resource
      Our design and build capabilities allowed us to identify and adopt different foundation techniques for different loading conditions, resulting in substantial cost savings for the client. Given the constraints on site, Keller planned the sequencing of execution in an effective manner.
      /sites/keller-asean/files/2019-10/project-summary-micropile-cs1-puteri-harbour-development.pdf
      Download
      KVMRT 2-Intervention shaft 2 project summary
      Resource
      Keller providing alternative retaining solution that resulted cost-savings and time-savings for client. The retaining structure completed ahead of project schedule enabling excavation works to start early. Deepest drilling depth (68m) throughout KVMRT line 2 project for rock fissure grouting…
      /sites/keller-asean/files/2019-10/project-summary-earth-retention-mrt-2-intervention-shaft.pdf
      Download
      Vibro brochure
      Resource
      Where ground improvement begins
      /sites/keller-asean/files/2019-10/Brochure-asean-vibro.pdf
      Download
      Soil mixing brochure
      Resource
      An efficient and flexible technology to overcome a variety of soil problems
      /sites/keller-asean/files/2019-10/Brochure-asean-soil-mixing_0.pdf
      Download
      Jet grouting brochure
      Resource
      An efficient and versatile method for soil treatment
      /sites/keller-asean/files/2019-10/Brochure-asean-jet-grouting.pdf
      Download
      Dynamic compaction and replacement brochure
      Resource
      Cost effective ground improvement method for use in various soil conditions
      /sites/keller-asean/files/2019-10/Brochure-asean-dynamic-compaction-replacement.pdf
      Download
      Rigid inclusions brochure
      Resource
      Efficient reduction of settlement
      /sites/keller-asean/files/2019-11/Brochure-asean-rigid-inclusions.pdf
      Download
      Tunnelling and urban infrastructure brochure
      Resource
      Geotechnical services for soil and rock retention and improvement
      /sites/keller-asean/files/2019-11/Brochure-apac-asean-tunneling-urban-infrastructure_0.pdf
      Purchase Order T&C - Singapore
      Resource
      The latest purchase order terms and conditions for Keller Singapore's vendors and partners. This file will be updated when necessary.
      /ksgpo
      Purchase Order T&C - Malaysia
      Resource
      The latest purchase order terms and conditions for Keller Malaysia's vendors and partners. This file will be updated when necessary.
      /node/3281
      Download
      Building a better world
      Resource
      Enabling low-impact, low carbon construction
      /sites/keller-asean/files/2021-09/k-brochure-sustainability-lower-carbon-products.pdf
      Download
      KWIC AMEA – Types of Allies
      Resource
      Which one will you be?
      /sites/keller-asean/files/2023-06/kwic-amea-workplace-allies-poster.pdf
      Footer CTAs
      • Request a quote
      • Get assistance
      • Contact us
      Home

      © 2025 Copyright Keller ASEAN 

      18 Boon Lay Way
      #04-104 Tradehub
      Singapore 609966

      Footer links
      • Keller Group
      • Careers

      Register for alerts

      Click on the button below to select the types of alerts you would like to receive

      Register for alerts
      Legal links
      • Terms of use
      • Privacy Policy
      • Manage cookies
      • Sitemap
      Social links
      • LinkedIn
      • YouTube