Skip to main content
+65 6316 8500
Service Menu
  • News
  • Resources
  • Careers
  • Worldwide contacts
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Vibro compaction
        • Vibro stone columns
        • Vibro concrete columns
        • Dynamic compaction
        • Dynamic replacement
        • Rapid impact compaction (RIC)
        • Dry soil mixing
        • Mass mixing
        • Wet soil mixing
      • Grouting
        • Cavity grouting
        • Compaction grouting
        • Jet grouting
        • Permeation grouting
        • Rock / fissure grouting
      • Deep Foundations
        • Micropiles
        • Bored piles
      • Earth retention
        • Anchors
        • Wet soil mixing
    • Solutions
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Liquefaction mitigation
        • Underpinning
      • Excavation support
      • Remediation
      • Seepage control
      • Stabilisation
        • Void filling
        • Tunnelling
      • Slope stabilisation
    • Markets
      • Industrial
      • Infrastructure
      • Oil, gas and chemical
      • Power
    • Design and build
  • Projects
  • How we work
    • Code of conduct
    • Values
    • Health and safety
    • Diversity and inclusion
    • Quality
    • Supporting our women
    • Sustainability
    • COVID-19 response
  • About us
    • Our leadership
    • Our commitment
    • About Keller Group
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Local offices
    • Request a quote
    • Get assistance
Keller ASEAN rig at work on site

Projects

Keller ASEAN has extensive experience across a wide variety of projects, large and small, and a proven track record of delivering these safely, on time and to high quality.
Breadcrumb
  1. Home
  2. Projects
Show me projects relating to
Search all projectsClear filters
4 projects found
Project image
Keller ASEAN Stormwater Management and Road Tunnel grouting project in Kuala Lumpur Malaysia
Solutions
Bearing capacity / settlement control
Markets
Infrastructure
Techniques
Jet grouting
Rock / fissure grouting
Compaction grouting

Storm Water Management and Road Tunnel

Location
Kuala Lumpur, Malaysia
Project image
Keller ASEAN project in Malaysia for Klang Valley MRT Line 2 Bandar Malaysia
Solutions
Bearing capacity / settlement control
Markets
Infrastructure
Techniques
Wet soil mixing
Jet grouting
Rock / fissure grouting

Klang Valley MRT Line 2 - Bandar Malaysia

Location
Malaysia
Project image
Jimah East Coal Fired Power Plant Malaysia
Solutions
Bearing capacity / settlement control
Markets
Power
Techniques
Wet soil mixing
Jet grouting
Vibro stone columns

Jimah East Coal Fired Power Plant

Location
Jimah, Negeri Sembilan, Malaysia
Project image
Strutless excavation using wet soil mixing system
Solutions
Excavation support
Seepage control
Techniques
Wet soil mixing
Jet grouting
Rock / fissure grouting
Anchors
Bored piles

The Colony by Infinitum

Location
Kuala Lumpur, Malaysia
Keller projects worldwide

Register for alerts

Read our privacy policy

Alert types
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller ASEAN 

18 Boon Lay Way
#04-104 Tradehub
Singapore 609966

Footer links
  • Keller Group
  • Careers

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Sitemap
Social links
  • LinkedIn
  • YouTube